Water Supply Connection Reference
Excerpt from the Order as of 29 December 2014, No 175 “On approval of the Rules for provision of equal access to regulated services (goods, works) in the sphere of natural...
State Communal Enterprise
Информация для абонентов
Excerpt from the Order as of 29 December 2014, No 175 “On approval of the Rules for provision of equal access to regulated services (goods, works) in the sphere of natural...
Приложение 6 к приказу Министра национальной экономики Республики Казахстан от 24 июня 2019 года № 58 Типовой договор на предоставление услуг водоснабжения и (или) водоотведения г. Тараз «___» ________ 2021г....
Topographic survey: the Department of Architecture and Urban Planning of the Taraz City Akimat. Address: 1A, Zhunisalieva Str., Taraz Technical Requirements: office No 5, the Operation and Maintenance Department (O&M Department)...
Territories serviced by the Customer Service Department No 1 № Engineer Project area Address, street 1/1 8 mkr:5-6-7-7A Abaja:117-12-121-123-128-130-132-134-140-144-146-148-148A-5-87 Bajzak batyra:189-191-200-203-205-209-215-219-223-225-232 Beregovaja 13. Dostevskogo-3A, Zheltoksan 254, Zhibek zholy...
Territories serviced by the Customer Service Department No 2 № Project area Address, street 1/1 Koshek batyra, Jaroshbaeva, Dursynova, Absemetova, Hadzhi-Mukana, 1-2-4- av. H.Mukana. Krupskaja, 1-2 -3 – av. Krupskoj,...
2017 fees for services provided by Water Metering Unit of SCE “Taraz Su” № Services Unit of measure Quantity Fee per unit in KZT, VAT included Total fee in KZT,...
For the water meter to be calibrated, the Customer provides to the Water Metering Unit controller’s notifications AO-1 and AO-2 about the water meter calibration and unsealing due to the...
Documents for Opening a personal account, change of ownership, and making a contract with private entities: A copy of the identification document; Statement of residence (for Public Service Centers); Copies...
Technologically relevant to core activities: – Replacement of gate valves; – Utility connection; – Installation of a directly connected water meter unit, D-15mm and D-20mm (without a water meter cost);...
To obtain preliminary Technical Requirements for designing and constructing water and/or wastewater systems, it is necessary to: Fill in the Application Form; and Accompany the Application with the following documents:...