{"id":342,"date":"2017-05-14T20:58:59","date_gmt":"2017-05-14T20:58:59","guid":{"rendered":"http:\/\/tarazsu.kz\/?p=342"},"modified":"2018-09-15T07:20:06","modified_gmt":"2018-09-15T07:20:06","slug":"%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8-%d0%bf%d0%be-%d0%b2%d0%be%d0%b4%d0%be%d1%81%d0%bd%d0%b0%d0%b1%d0%b6%d0%b5%d0%bd%d0%b8%d1%8e-%d0%b2%d1%81-%d0%b8-%d0%b2%d0%be%d0%b4%d0%be%d0%be%d1%82%d0%b2%d0%b5","status":"publish","type":"post","link":"https:\/\/tarazsu.kz\/en\/2017\/05\/14\/%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8-%d0%bf%d0%be-%d0%b2%d0%be%d0%b4%d0%be%d1%81%d0%bd%d0%b0%d0%b1%d0%b6%d0%b5%d0%bd%d0%b8%d1%8e-%d0%b2%d1%81-%d0%b8-%d0%b2%d0%be%d0%b4%d0%be%d0%be%d1%82%d0%b2%d0%b5\/","title":{"rendered":"Water Supply and Sewerage Services"},"content":{"rendered":"<p><strong>Technologically relevant to core activities:<\/strong><\/p>\n<p>\u2013 Replacement of gate valves;<\/p>\n<p>\u2013 Utility connection;<\/p>\n<p>\u2013 Installation of a directly connected water meter unit, D-15mm and D-20mm (without a water meter cost);<\/p>\n<p>\u2013 Reconnection to the urban water supply system;<\/p>\n<p>\u2013 Sealing of water meters;<\/p>\n<p>\u2013 A septic tank and sewage pumping.<\/p>\n<p><strong>Technologically irrelevant to core activities:<\/strong><\/p>\n<p>\u2013 Maintenance of city fountains;<\/p>\n<p>\u2013 Inspection and minor repair work in cellars of multiple dwellings.<\/p>\n<p><strong>Technologically relevant to core activities:<\/strong><\/p>\n<p>\u2013 Inspection of water meters belonging to water users;<\/p>\n<p>\u2013 Technical maintenance of outdoor water supply networks (replacement of gate valves, installation of fire hydrants);<\/p>\n<p>\u2013 Elimination of water leaks and ruptures on water and wastewater networks;<\/p>\n<p>\u2013 Water cleaning of sewer networks;<\/p>\n<p>\u2013 Hydraulic pressure testing of water supply systems;<\/p>\n<p>\u2013 The connection of a new customer not foreseen in the design to the urban water supply and sewerage system being on the balance sheet of the natural monopoly entity;<\/p>\n<p>\u2013 Customer reconnection after debt repayment (sewerage);<\/p>\n<p>\u2013 Repair of water supply system and equipment (water networks, gate valves, fire hydrants, electric motors);<\/p>\n<p>\u2013 Pumping legal entities\u2019 septic tanks and cesspools;<\/p>\n<p>\u2013 Testing water from water and wastewater systems.<\/p>\n<p><strong>Technologically irrelevant to core activities:<\/strong><\/p>\n<p>\u2013 Road transport services;<\/p>\n<p>\u2013 Design of water supply and sewerage systems.<\/p>\n<p><strong>Technologically relevant to regulated water and (or) wastewater services (goods, works):<\/strong><\/p>\n<p>\u2013 Delivery of water from water intakes for domestic needs by water tank trucks;<\/p>\n<p>\u2013 Outdoor water and wastewater system services;<\/p>\n<p>\u2013 Maintenance of indoor water supply system;<\/p>\n<p>\u2013 Maintenance of indoor sewerage system;<\/p>\n<p>\u2013 Installation of water meters;<\/p>\n<p>\u2013 Maintenance of outdoor water supply system:<\/p>\n<p>\u2013 Maintenance of outdoor sewerage system;<\/p>\n<p>\u2013 Repair of sewerage systems and equipment;<\/p>\n<p>\u2013 A customer reconnection after debt repayment (water supply);<\/p>\n<p>\u2013 Pumping natural persons\u2019 septic tanks and cesspools.<\/p>\n<p><strong>Technologically irrelevant to regulated water and (or) wastewater services (goods, works):<\/strong><\/p>\n<p>\u2013 capital repair and reconstruction of residential, civil, and industrial buildings and facilities (water wells, wastewater treatment facilities, reconstruction of water and wastewater systems, set up of installations and small architecture structures, dwelling repair, and maintenance of city fountains), including the strengthening of load-bearing structures but excluding the restoration of historic and cultural monuments.<\/p>\n<p>Reception and treatment of the wastewater with maximum permissible pollutant concentrations (MPC).<\/p>\n<p><strong>Technologically irrelevant to regulated water and (or) wastewater services (goods, works):<\/strong><\/p>\n<p>\u2013 Water meter resealing;<\/p>\n<p>\u2013 Land and premise lease;<\/p>\n<p>\u2013 Capital repair and reconstruction of residential, civil, and industrial buildings and facilities (wastewater treatment facilities, reconstruction of water and wastewater systems, and dwelling repair), including the strengthening of load-bearing structures but excluding the restoration of historic and cultural monuments.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Technologically relevant to core activities: \u2013 Replacement of gate valves; \u2013 Utility connection; \u2013 Installation of a directly connected water meter unit, D-15mm and D-20mm (without a water meter cost);&#8230; <\/p>\n","protected":false},"author":1,"featured_media":557,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[],"class_list":["post-342","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-info_for_customers"],"translation":{"provider":"WPGlobus","version":"3.0.0","language":"en","enabled_languages":["ru","kz","en"],"languages":{"ru":{"title":true,"content":true,"excerpt":false},"kz":{"title":true,"content":false,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/comments?post=342"}],"version-history":[{"count":6,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/342\/revisions"}],"predecessor-version":[{"id":2704,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/342\/revisions\/2704"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/media\/557"}],"wp:attachment":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/media?parent=342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/categories?post=342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/tags?post=342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}