{"id":1155,"date":"2017-06-27T04:58:48","date_gmt":"2017-06-27T04:58:48","guid":{"rendered":"http:\/\/tarazsu.kz\/?p=1155"},"modified":"2020-11-11T13:00:38","modified_gmt":"2020-11-11T07:00:38","slug":"%d0%b2-%d0%b3%d0%ba%d0%bf-%d1%82%d0%b0%d1%80%d0%b0%d0%b7-%d1%81%d1%83-%d0%b1%d1%83%d0%b4%d1%83%d1%82-%d0%b2%d0%bd%d0%b5%d0%b4%d1%80%d0%b5%d0%bd%d1%8b-%d0%b3%d0%b5%d0%be-%d0%b8%d0%bd%d1%84","status":"publish","type":"post","link":"https:\/\/tarazsu.kz\/en\/2017\/06\/27\/%d0%b2-%d0%b3%d0%ba%d0%bf-%d1%82%d0%b0%d1%80%d0%b0%d0%b7-%d1%81%d1%83-%d0%b1%d1%83%d0%b4%d1%83%d1%82-%d0%b2%d0%bd%d0%b5%d0%b4%d1%80%d0%b5%d0%bd%d1%8b-%d0%b3%d0%b5%d0%be-%d0%b8%d0%bd%d1%84\/","title":{"rendered":"SCE \u201cTaraz Su\u201d introduces Geographic Information Systems (GIS) and Hydraulic Modeling"},"content":{"rendered":"<p>SCE \u201cZhambyl su\u201d introduces Geographic Information Systems (GIS) and Hydraulic Modeling<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1198\" src=\"http:\/\/tarazsu.kz\/wp-content\/uploads\/2017\/06\/photo_2017-06-27_10-57-25-1024x576.jpg\" alt=\"\" width=\"780\" height=\"439\" srcset=\"https:\/\/tarazsu.kz\/wp-content\/uploads\/2017\/06\/photo_2017-06-27_10-57-25-1024x576.jpg 1024w, https:\/\/tarazsu.kz\/wp-content\/uploads\/2017\/06\/photo_2017-06-27_10-57-25-300x169.jpg 300w, https:\/\/tarazsu.kz\/wp-content\/uploads\/2017\/06\/photo_2017-06-27_10-57-25-768x432.jpg 768w, https:\/\/tarazsu.kz\/wp-content\/uploads\/2017\/06\/photo_2017-06-27_10-57-25.jpg 1280w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/p>\n<p>On 6 June 2017, SCE \u201cTaraz Su\u201d entered into the Contract \u201cDevelopment of the Performance Improvement Plan for the water supply networks\u201d (the Project No\u00a042664) with \u201cEcoInfraEngineering\u201d LLP intended to implement GIS and Hydraulic Modeling of water supply systems within the Taraz Water Project financed by the European Bank for Reconstruction and Development and the Akimat of Taraz City.<\/p>\n<p>\u201cEcoInfraEngineering\u201d LLP (the Republic of Kazakhstan, the Lead Consultant) is a contractor together with \u201cEcoInfraEngineering\u201d LLC (the Russian Federation, the sub-consultant), \u201cSchneider Electric\u201d LLP (the Republic of Kazakhstan, the sub-consultant), and \u201cDevir\u201d LLP (the Republic of Kazakhstan, the sub-consultant).<\/p>\n<p>It is envisaged under this component of the Project to go through the following stages:<\/p>\n<ul>\n<li>Making an electronic map of the entire water supply system with the consumption data pertaining to every customer. Inputting consumption data into an address plan of the map;<\/li>\n<li>Creating a dynamic hydraulic model of the existing water supply system;<\/li>\n<li>Development of assessment criteria (energy efficiency, capital intensity, payback period, and etc.) and modernization criteria for the water supply system;<\/li>\n<li>Determination of water pressure for every customer. Elaboration of measures to keep the required pressure in the water supply system (for zoning, pressure loss response, and etc.);<\/li>\n<li>Giving options of modernizing the water supply system and selecting the best one. Giving recommendations for the water supply system development.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>SCE \u201cZhambyl su\u201d introduces Geographic Information Systems (GIS) and Hydraulic Modeling On 6 June 2017, SCE \u201cTaraz Su\u201d entered into the Contract \u201cDevelopment of the Performance Improvement Plan for the&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1198,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"translation":{"provider":"WPGlobus","version":"3.0.0","language":"en","enabled_languages":["ru","kz","en"],"languages":{"ru":{"title":true,"content":true,"excerpt":false},"kz":{"title":false,"content":false,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/1155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/comments?post=1155"}],"version-history":[{"count":11,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/1155\/revisions"}],"predecessor-version":[{"id":3896,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/posts\/1155\/revisions\/3896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/media\/1198"}],"wp:attachment":[{"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/media?parent=1155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/categories?post=1155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tarazsu.kz\/en\/wp-json\/wp\/v2\/tags?post=1155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}